RRR Buddy

EPA Leak-Rate Calculator (40 CFR Part 82 Subpart F & Part 84 Subpart C)

Inputs
Outputs
20.3%
10.0%
YES
Repair required within 30 days (or 120 days if process shutdown) and perform verification tests per 40 CFR §82.157(d)-(f).
References (clickable):

Disclaimer: This tool summarizes federal rules as of Sep 2025 for convenience only. Consult the eCFR links above for controlling text.